Green Ship Solutions (Turn-Key Concept)

Scrubber installation

  • Inspection Onboard (3D scanning)
  • Verification of existing documentation
  • Plug and Play concept
  • Precise onboard measurements
  • 3D CAD model of new installation
  • Classification and Workshop documentation
  • Strength calculations
  • Vibration and stability calculations
  • Etc

Electric shore supply

  • Verification of existing documentation
  • Onboard survey
  • Conceptual design
  • Selection of electrical system/manufacturer
  • Classification documentation for approval
  • Workshop documentation
  • Installation on ship
  • Crew training

Ballast water management system

  • Verification of existing documentation
  • Onboard survey
  • Conceptual design
  • Selection of ballast water treatment system/manufacturer
  • Classification documentation for approval
  • Workshop documentation
  • Installation on ship
  • Crew training